Quote:
Originally Posted by jrstech
I have a '20 M550 on order showing status "order received", prior to the factory shutting down it was in "scheduled for production" status. I'm now told it will likely enter production towards end of June but the MY2021 is due to start production 7/1. Not sure whether the order gets produced as a '20 or if I'll need to re-order a '21.
|
You should look at the MY21 order guide Don't assume everything will be the same