View Single Post
      08-05-2020, 11:08 AM   #196
TomWinMD
Tom W
TomWinMD's Avatar
United_States
135
Rep
194
Posts

Drives: 2021 (G30) 550xi
Join Date: May 2020
Location: Maryland

iTrader: (0)

Delivery Date! (and an Updated and Final Timeline).

I heard from my CA this morning. Delivery at the PDC is scheduled for 1 September. (I've been waiting six months, what's four more weeks?)

So here's what should be the final timeline.

(Read: Event: Date - Elapsed days since production number assigned (Amplifying comments.)

Production number received (Status 111): 5/28 - Day 0 (BMW reflects some, but not all of the options from my original order.)

Scheduled for production (Status 112): 5/29 - 1 Day elapsed from production number.

(I made some changes to the configuration at this point due to the LCI dropping some options, but since the car hadn’t begun production, it did not impact the timeline. The changes were committed on 6/5/2020.)

The car entered production and a VIN was assigned (Status 150): 6/16 – Day 19 (Any changes to the options, etc. after this point would have delayed the build of the car.)

Exterior body assembly and painting (Status 151 & 152): 6/29 – Day 32

Entered the assembly line (Status 153): 6/30 – Day 33

Assembly in progress, quality check, final assembly, ready for transport, and awaiting carrier assignment (Status 155 & 182): 7/1 – Day 34 (A total of 3 days to build the car, including a 24 hour delay (probably for the paint to complete curing, the next dayshift, etc.)

On the train to Bremerhaven (Status 190): 7/2 – Day 35

At the Port of Bremerhaven (Status 193): 7/3 – Day 36

In transit (on the Ro Ro Ship HORIZON HIGHWAY – Status 195): 7/8 – Day 41

I lost updated tracking on the ship on 7/14 (Day 47) after it made a couple of port visits and headed out across the Atlantic. Rather than paying for the Satellite tracking (or playing the sign up for 7 days free, and sign up again), I waited for the ship to get in range of a U.S. east coast shore AIS station, which happened Friday (7/24 - Day 57) as the ship approached the Chesapeake Bay.

From Bremerhaven to Baltimore, total transit time was 22 days (the ship docked on 7/25 – Day 58).

The ship then left Baltimore for Brunswick, GA on 7/27 (Day 60) and docked in Brunswick on 7/29 (Day 62).

The Horizon Highway left Brunswick on 7/31 (Day 64) and docked at Charleston on 8/1 (Day 65).

The car was un-loaded on 8/1 (Day 65) and began processing at the port on 8/3 (Day 67).

On 8/65 (Day 69), my CA informed me that the car had cleared the engineering holds (likely due to emissions inspection for the new MY cars) and the PDC was scheduling delivery for 9/1 (Day 96).

So, 96 calendar days from production number assignment to delivery at the PDC in South Carolina. I think that number is the more realistic benchmark to be aware of, because...

If we count from the day I placed the order and put down the deposit, it's taken six months, bearing in mind that includes the impact of the pandemic - which included a month long shutdown at the factories in Germany, and the delay caused by BMW's cancellation of all 2020 MY production of the M550i as production resumed, which converted the orders into 2021 MY cars.

If you have any questions, please feel free to ask. I'll post some additional information about the PDC delivery soon.
__________________
Safe travels!

Tom

2003 E65 745i | 2011 F10 550i | 2021 G30 M550xi

Last edited by TomWinMD; 08-05-2020 at 12:58 PM.. Reason: Corrected a typo.
Appreciate 0